PRECISION MACHINING

A defect caught at factory acceptance, not on the floor

$41K

AVOIDED REWORK

4 days

FIX AT INTEGRATOR

1st

SITE ACCEPTANCE PASS

200

CYCLES AT RATE PROVEN

Challenge

A precision CNC job shop with a two-person engineering group wanted lights-out machine tending across four mills. Unlike most deals in this category the customer was sophisticated: they had drawings, they had a controls engineer, and they wanted a formal requirements specification and a lease structure rather than a subscription.

Approach

The same pipeline ran at a different parameterization: a full user requirement specification was produced, light I/O integration questions applied, and the capital track was structured as a lease against verified asset value. Because the customer could answer technical questions directly, question tiering was raised rather than simplified. Factory acceptance was run as a gated milestone at the integrator's facility, requiring video evidence of 200 consecutive cycles at target rate before shipment was authorized.

Outcome

  • Factory acceptance surfaced a gripper repeatability drift on small-diameter blanks at cycle 140, corrected at the integrator's facility over four days
  • The same defect discovered on site would have carried an estimated $41K in travel, downtime, and re-commissioning
  • Site acceptance passed on the first attempt
  • Lease closed against acceptance evidence rather than a projected specification

We have been through installs where the first anyone learns of a problem is when it stops the line. This one was boring, and boring is what I wanted.

Director of Manufacturing Engineering